Upstairs...

Once the steel support for the partial second story is in place, things start moving upstairs.

Photo - 1/28/03
With corrugated steel subflooring
in place, Terry and Jeff install
the South upstairs walls .


Photo - 1/28/03
Here, they lift the Spaceframe
panel for the South wall of
our study into place...


Photo - 1/28/03
...atop the 550 lb. steel I-beam
that spans the living room and
dining room ceilings below.


Photo - 1/28/03
The walls are temporarily braced.
Moon Mountain can be seen through
the two window openings.


Photo - 1/28/03
A layer of plywood subflooring is then
glued and screwed to the corrugated steel layer.


Photo - 1/31/03
Additionl panels extend the South wall to
its full height. A series of square window openings
run across the top of the study and...


Photo - 1/31/03
...the adjoining guest bedroom/hobby
room. Ultimately, this room will have
the best view of Moon Mountain.


Photo - 1/31/03
The panels making up the interior walls
are anchored in place with screws.


Photo - 2/1/03
The second story is seen here from the driveway.
Foam panels that will insulate the roof
have been temporarily stored in the carport area.


Photo - 2/1/03
Plywood sheathing is then attached
to the outside of the upstairs walls.


Photo - 2/1/03
Here's the view from the hillside,
partway up our driveway on February 1, 2003.
The second floor can be seen through the tree branches.


Note: We have some photos of the Spaceframe fabrication equipment and process.

Home | Beginnings | Flood | Foundation pour | Blocks & tanks | Cistern
Stacking| Prep for wall pour | Wall pour | Floor beams | Floor pan | Floor pour
Stacking II | Interior walls | Moving up | Decks | Upstairs | Roof | Roof II
Dogrun | Roof III | Sticks 'n stones | Decks II | Floors & windows | Sheetrock & stairs
Railing & siding | Texture & metal | Exterior | Cabinets & floors | Counters & such
Rainwater system | Dogrun II | Final stuff

Green Building | Technologies | Credits




©2002 Email: herb at moonmountaingroup.com
http://www.moonmountaingroup.com/home/upstairs1.html  -  Modified: Jun-04-03