Another delivery day!

On August 7, our fiberglass 14 foot diameter, 13 foot high, 15,000 gallon rainwater cistern arrived.

As mentioned earlier, we are installing a rainwater collection system which will provide us with a better tasting, more reliable source of water than our well. The system incorporates two surge tanks under the house to store water if it arrives faster than our 100-gallon-per-minute pump can send it up the hill to the cistern.

For more information about rainwater collection, see our Technologies page.

Photo - 8/7/02
The oversize load arrives on Canyon Oaks Drive...

Photo - 8/7/02
...is lifted up...
Photo - 8/7/02
...up & over...
Photo - 8/7/02
...down...
Photo - 8/7/02
...down...
Photo - 8/7/02
...down...
Photo - 8/7/02
...and down.
Photo - 8/7/02
It's muscled into final position...
Photo - 8/7/02
...and almost disappears in its new arboreal home
at the top of our hill.


Home | Beginnings | Flood | Foundation pour | Blocks & tanks | Cistern
Stacking| Pour preparation | Wall pour | Floor beams | Floor pan | Floor pour
Stacking II | Interior walls | Moving up | Decks | Upstairs | Roof | Roof II
Dogrun | Roof III | Sticks 'n stones | Decks II | Floors & windows | Sheetrock & stairs
Railing & siding | Texture & metal | Exterior | Cabinets & floors | Counters & such
Rainwater system | Dogrun II | Final stuff

Green Building | Technologies | Credits




©2002 Email: herb at moonmountaingroup.com
http://www.moonmountaingroup.com/home/cistern.html  -  Modified: Jun-04-03