A lot of small details came together before we moved in on November 15, 2003. We still have a lot of little things to take care of, but it's a joy to be living in this house...finally!


Photo - 10/24/03
Screens were installed
for the screened deck.


Photo - 1/4/04
Steel cables were installed
for all of the railings.

Photo - 10/24/03
The woodburning stove
vent pipe was installed
inside...


Photo - 10/24/03
...and out.

Photo - 1/9/04
The high efficiency stove
has been great this winter.


Photo - 11/3/03
For the driveway, we used StoneyCrete™,
a new pervious concrete product that allows
rainwater to reach the tree roots...


Photo - 12/30/03
...and prevents washout and soil runoff into the river
during heavy rainfalls ("gully washers").


Photo -1/3/04
As we settle in we're finding that the house is very comfortable,
and provides a feeling of close contact with the outdoors.
Just what we wanted!



Home | Beginnings | Flood | Foundation pour | Blocks & tanks | Cistern
Stacking| Prep for wall pour | Wall pour | Floor beams | Floor pan | Floor pour
Stacking II | Interior walls | Moving up | Decks | Upstairs | Roof | Roof II
Dogrun | Roof III | Sticks 'n stones | Decks II | Floors & windows | Sheetrock & stairs
Railing & siding | Texture & metal | Exterior | Cabinets & floors | Counters & such
Rainwater system | Dogrun II | Final stuff

Green Building | Technologies | Credits




© 2002-04 Email: herb at moonmountaingroup.com
http://www.moonmountaingroup.com/home/final.html  -  Modified: Jan-12-04