Home | Beginnings | Flood | Foundation pour | Blocks & tanks | Cistern
Stacking| Prep for wall pour | Wall pour | Floor beams | Floor pan | Floor pour
Stacking II | Interior walls | Moving up | Decks | Upstairs | Roof | Roof II
Dogrun | Roof III | Sticks 'n stones | Decks II | Floors & windows | Sheetrock & stairs
Railing & siding | Texture & metal | Exterior | Cabinets & floors | Counters & such
Rainwater system | Dogrun II | Final stuff

Green Building | Technologies | Credits

At long last...

The exterior walls of the house are finished as work inside continues.


Photo - 9/4/03
Horizontal Galvalume
siding completes the
master deck privacy wall.


Photo - 12/14/03
The deck is open on
the side overlooking the river.

Photo -12/14/03
More horizontal siding encloses the platform for
one of the heat pumps on the right,
giving a finished look to this side of the house.


Photo - 9/19/03
Steel frames form the
back wall of the carport
and the gate to the back deck.


Photo - 9/24/03
Galvalume siding
is installed next...


Photo - 10/19/03
...completing the
the carport area.


Photo - 12/14/03
The siding on the other sides
of the house is completed by another crew.


Photo - 10/24/03
Work also is progressing on the inside as
a record number of worker vehicles fills the lower driveway.
Late arrivals are parked on the road at the top of the hill.



Home | Beginnings | Flood | Foundation pour | Blocks & tanks | Cistern
Stacking| Prep for wall pour | Wall pour | Floor beams | Floor pan | Floor pour
Stacking II | Interior walls | Moving up | Decks | Upstairs | Roof | Roof II
Dogrun | Roof III | Sticks 'n stones | Decks II | Floors & windows | Sheetrock & stairs
Railing & siding | Texture & metal | Exterior | Cabinets & floors | Counters & such
Rainwater system | Dogrun II | Final stuff

Green Building | Technologies | Credits




© 2002-04 Email: herb at moonmountaingroup.com
http://www.moonmountaingroup.com/home/exterior.html  -  Modified: Jan-12-04