Progress inside and out.


Photo - 8/30/03
Galvalume metal siding
upstairs and down defines
the dogrun.


Photo - 8/30/03
As the fascia and
soffits go on, the final
appearance unfolds.


Photo - 8/30/03
No painting needed!
Photo -8/30/03
A little texture and the walls
are closer to their final appearance.


Photo -9/3/03
Wood window sills and
base molding are installed.


Photo - 8/26/03
The stairs from the main
floor to the dogrun loft
are welded in place.


Photo - 8/30/03
The view toward the
screened deck from
just inside the front door.


Photo - 8/30/03
The stairs from the screened
deck after the Ipe stair
treads are installed.


Photo - 8/23/03
The last of the steel support
for the back deck is welded
in place.


Photo - 9/3/03
Steel framing for the back wall
of the carport is installed.




Home | Beginnings | Flood | Foundation pour | Blocks & tanks | Cistern
Stacking| Prep for wall pour | Wall pour | Floor beams | Floor pan | Floor pour
Stacking II | Interior walls | Moving up | Decks | Upstairs | Roof | Roof II
Dogrun | Roof III | Sticks 'n stones | Decks II | Floors & windows | Sheetrock & stairs
Railing & siding | Texture & metal | Exterior | Cabinets & floors | Counters & such
Rainwater system | Dogrun II | Final stuff

Green Building | Technologies | Credits




©2002 Email: herb at moonmountaingroup.com
http://www.moonmountaingroup.com/home/texture-metal.html  -  Modified: Sep-03-03