More progress...

During the week of June 30th the concrete floors were scored and stained, and the windows were installed.


Photo - 6/30/03
First, a diagonal pattern of three
foot squares was scored into
the living and dining room
floors using a diamond blade



Photo - 6/30/03
Next the concrete floors were
smoothed and cleaned thoroughly.

Photo - 6/30/03
An acid stain was then applied and
allowed to react with the concrete.
Better floors through chemistry...

Photo -7/1/03
By the next morning, the desired color
was achieved and the chemical reaction
was halted by rinsing the floor with water.


Photo -7/1/03
An acrylic sealer was then
applied. The color is a close
match to the gold in the
limestone blocks.


Photo -7/1/03
We quickly covered the floors with
plastic and masonite to protect
them during the rest of
the construction.


Photo - 7/1/03
Installation of our windows
started the same day.


Photo - 7/1/03
The large dogrun windows were
the most challenging.


Photo - 7/1/03
Here, the last of the
windows is installed.


Photo - 7/2/03
The awning style windows
are designed to remain
open in the rain.


Photo - 7/5/03
The living and dining room windows really
change the feeling of the rooms
--still very open to the outdoors but cozier.


Photo - 7/5/03
The natural wood windows
add a nice touch to
the dogrun.




Home | Beginnings | Flood | Foundation pour | Blocks & tanks | Cistern
Stacking| Prep for wall pour | Wall pour | Floor beams | Floor pan | Floor pour
Stacking II | Interior walls | Moving up | Decks | Upstairs | Roof | Roof II
Dogrun | Roof III | Sticks 'n stones | Decks II | Floors & windows | Sheetrock & stairs
Railing & siding | Texture & metal | Exterior | Cabinets & floors | Counters & such
Rainwater system | Dogrun II | Final stuff

Green Building | Technologies | Credits




©2002 Email: herb at moonmountaingroup.com
http://www.moonmountaingroup.com/home/floor-windows.html  -  Modified: Jul-06-03