The pace picks up...

Finally, work is progressing more rapidly as multiple crews do their thing.


Photo - 8/18/03
A one-man crew named Herb
installed IPÊ railings around
the main open deck.


Photo - 8/16/03
The railings as seen from the screened deck...
Stainless steel cables strung below the railings
will provide safety without blocking the view.

Photo -8/19/03
Sheetrock has been installed, taped and floated.
Texturing comes next. This is a view of
the living and dining areas.
They almost look like real rooms now.


Photo -8/16/03
The all-important kitchen.

Photo - 8/18/03
Corrugated Galvalume siding
is finally being installed,
here on the South wall of the
upstairs guest rooms...


Photo - 8/18/03
...here, inside the screened deck.
The dogrun can be seen through the
door on the right.


Photo - 8/19/03
Here, on the walls of Herb's shop/studio.
Stone columns will be installed
at the corners.


Photo - 8/16/03
More steel has been welded in place,
here for the back deck. Red approves of
the "factory installed" cutout for his doggy door.


Photo - 8/18/03
Vertical supports for the master deck
privacy wall also are in place.
We approve of these.




Home | Beginnings | Flood | Foundation pour | Blocks & tanks | Cistern
Stacking| Prep for wall pour | Wall pour | Floor beams | Floor pan | Floor pour
Stacking II | Interior walls | Moving up | Decks | Upstairs | Roof | Roof II
Dogrun | Roof III | Sticks 'n stones | Decks II | Floors & windows | Sheetrock & stairs
Railing & siding | Texture & metal | Exterior | Cabinets & floors | Counters & such
Rainwater system | Dogrun II | Final stuff

Green Building | Technologies | Credits




©2002 Email: herb at moonmountaingroup.com
http://www.moonmountaingroup.com/home/railing-siding.html  -  Modified: Aug-19-03