inside the house, important components are being installed.


Photo - 9/17/03
Hickory cabinets are unloaded...

Photo - 9/17/03
...and installed by
our local cabinetmakers.

Photo -9/17/03
The kitchen takes shape...

Photo -9/17/03
...bringing joy to the resident chef.

Photo - 10/16/03
Old-fashioned linoleum was
chosen for the kitchen floor...


Photo - 10/17/03
...because we like its looks, and it is
environmentally friendly,
and very durable.


Photo - 10/17/03
Linoleum extending into the pantry.

Photo - 10/16/03
Linoleum also will be
used throughout the
top floor.


Photo - 10/19/03
Natural cork is used
for the master and
guest bedrooms.
Photo - 10/24/03
A big day! The appliances arrive.
We chose the most energy- and water-
efficient models that we could afford.



Home | Beginnings | Flood | Foundation pour | Blocks & tanks | Cistern
Stacking| Prep for wall pour | Wall pour | Floor beams | Floor pan | Floor pour
Stacking II | Interior walls | Moving up | Decks | Upstairs | Roof | Roof II
Dogrun | Roof III | Sticks 'n stones | Decks II | Floors & windows | Sheetrock & stairs
Railing & siding | Texture & metal | Exterior | Cabinets & floors | Counters & such
Rainwater system | Dogrun II | Final stuff

Green Building | Technologies | Credits




© 2002-04 Email: herb at moonmountaingroup.com
http://www.moonmountaingroup.com/home/cabinets.html  -  Modified: Jan-08-04